News

Sort by date:   Calendar ... Calendar      

05.30.2019 Izhorskiye Zavody Passes Technical Audit of Rosneft Oil Company PJSC
Izhorskiye Zavody, being a part of the OMZ Group, has passed a technical audit to supply oil and gas refining equipment for Rosneft Oil Company PJSC.
05.15.2019 Izhorskiye Zavody successfully conducted hydrostatic tests of VVER-1000 Reactor Vessel for the fourth unit of Kudankulam NPP.
Izhorskiye Zavody, being a part of OMZ Group, successfully conducted hydrostatic tests of  VVER-1000 Reactor Vessel for the fourth unit of Kudankulam NPP (India).
03.11.2019 Izhorskiye Zavody Continues Manufacturing Equipment for Kudankulam NPP
Izhorskiye Zavody, being a part of the OMZ Group, has started assembling the transport lock for Unit three of Kudankulam NPP (India).
01.15.2019 Izhorskiye Zavody Successfully Passes Bureau Veritas Recertification Audit
Izhorskiye Zavody, being a part of the OMZ Group, has successfully passed a recertification audit for compliance of Quality Management System (QMS) with the requirements of ISO 9001:2015 international standard.
01.14.2019 Izhorskiye Zavody Successfully Passes Recertification Audit According to ASME Code
Izhorskiye Zavody, being a part of the OMZ Group, has successfully passed a recertification audit for the right to manufacture high-pressure vessels in accordance with the requirements of ASME Code (American Society of Mechanical Engineers).
09.28.2015 Izhorskiye Zavody Successfully Delivers Two Reactors to Tatneft Site
Izhorskiye Zavody, part of OMZ Group, has delivered 1600-R-0101 diesel fuel hydrofining reactor and 4200-R-0101 heavy gas oil hydrofining reactor to Tatneft complex of oil refineries and petrochemical plants in Nizhnekamsk.
09.01.2015 Izhorskiye Zavody Completes Production of Main Circulator Pumps for the Fourth Power Unit of Tianwan NPP
Izhorskiye Zavody, part of OMZ Group, has completed production and begun delivery of main circulator pumps (MCP) for the fourth power unit of Tianwan NPP (China). Two pumps have already been delivered to the customer, and two more will be shipped this autumn.
08.18.2015 Izhorskiye Zavody to Produce Equipment for the Third Power Unit of Kudankulam NPP
Izhorskiye Zavody has signed a contract for production of equipment for the third power unit of Indian Kudankulam NPP, currently under construction. Under this contract Izhorskiye Zavody will produce VVER-1000 reactor vessel together with internal components and an upper unit lid, a pressurizer and main circulation piping.
08.13.2015 Izhorskiye Zavody Successfully Completes Hydrostatic Testing of VVER-1200 Reactor Vessel for the Second Power Unit of Leningrad NPP-2
Izhorskiye Zavody, part of OMZ Group, has successfully performed hydrostatic tests on VVER-1200 reactor vessel for the second power unit of Leningrad NPP-2.
08.10.2015 OMZ-Izhora Successfully Passes Quality Management System Recertification
OMZ-Izhora, part of OMZ Group, has successfully passed a recertification audit for compliance of its quality management system with GOST ISO 9001-2011 and ISO 9001-2008 standards.

News 1 - 10 of 93
First | Prev. | 1 2 3 4 5 6 7 8 9 10 | Next | Last All